LOGCAP VI

FORGE was built for LOGCAP VI. Not adapted for it.

Every capability in the FORGE platform maps directly to a Performance Work Statement requirement. Not approximately. Exactly.

The PWS requires what no commercial platform provides.

We mapped every capability gap before we wrote a line of code. FORGE closes all of them.

PWS RequirementWhat Exists TodayFORGE Status
98% Dashboard Uptime AQLCommercial SaaS targets 99.9% but no AQL accountability Met — Multi-AZ GovCloud SLA
GCSS-Army Bidirectional SyncRead-only ERP imports, no write-back Met — REST + EDI bidirectional
85% NSN Forecast AccuracyStatistical forecasting at 60–70% Met — SageMaker ML at ≥85%
≥90% OR Rate SustainedReactive maintenance only Met — Predictive failure models
85–100% CDRL AutomationManual production, 3 weeks per quarter Met — Auto-generated CDRL S-02
Contested Logistics ITVStatic maps, no threat overlay Met — Real-time threat feeds + TAK
Mobile Field OperationsTablet-only, no offline mode Met — iOS + Android offline-first
DFARS 252.204-7012 CUICommercial AWS — non-compliant for CUI Met — AWS GovCloud only
For Primes

Your subcontractor tier — visible for the first time.

What FORGE Gives the Prime

  • ▸ Consolidated dashboard across all subcontractor task orders
  • ▸ Roll-up CDRL reporting at the prime level
  • ▸ Subcontractor performance scorecards
  • ▸ Real-time AWP visibility across the supply chain
  • ▸ OR rate aggregation by sub, region, equipment class

What This Means for Performance

  • ▸ Improved CPARS ratings — visibility prevents missed deliveries
  • ▸ Higher award fee — measurable AQL compliance
  • ▸ DCAA audit-ready — automated cost exhibit generation
  • ▸ Reduced subcontractor management overhead
  • ▸ Faster response to contracting officer inquiries
For Subcontractors

Walk in with a live compliance answer.

Winning Task Orders

Before
Compliance described as a plan in the proposal
With FORGE
Live FORGE deployment referenced in the technical volume

CDRL Production

Before
3 weeks per quarter of finance team labor
With FORGE
Auto-generated, reviewed and submitted in 2 hours

OR Rate Management

Before
Reactive — failures drive AWP
With FORGE
Predictive — failures prevented before they happen

COTR Relationship

Before
Monthly status calls with stale data
With FORGE
COTR-accessible dashboard, real-time

Reference a live FORGE deployment in your technical proposal.

Most subcontractor proposals describe compliance as a plan. Yours will reference a working system.

From task order award to full operational capability in 30 days.

1
Day 1
GovCloud provisioned
2
Day 3
Tenant configured
3
Day 7
GCSS-Army connector live
4
Day 10
Inventory imported
5
Day 14
Mobile apps deployed
6
Day 18
Operator training
7
Day 24
First WO cycle
8
Day 30
First CDRL automated

PWS Compliance Matrix

Eight requirements. Eight solutions. All shipped, all measured.

PWS ReferenceRequirementFORGE SolutionAQL / Standard
§02.01.02Contested Logistics VisibilityTheater threat map with TAK CoTReal-time
§02.01.04(e)Logistics COP DashboardMulti-AZ AWS GovCloud, role-based98% monthly uptime
§05.00Asset VisibilityRFID/AIT, GCSS-Army bidirectional100% serial coverage
§05.02GCSS-Army IntegrationREST + EDI bidirectional sync<5 min latency
§05.06Supply Chain Analytics3-tier: Foundational → Predictive → AI≥85% NSN forecast
§06.00Predictive MaintenanceSageMaker ML failure models≥90% OR rate
§06.04PMCS AutomationAuto-schedule from inspection findingsZero missed PMCS
§02.04Cybersecurity TabletopCloudTrail audit export packageAnnual

Ready to win your next LOGCAP task order?

Request a Demo →